Screenshot
Jaw Control Mechanism
Stress Analysis Using Abaqus
Stress Analysis Using Abaqus
Gear Drive
Manufactured 1
Robot and Master

TELE SURGICAL ROBOTIC ARM

8th Fan Votes Winner - 2015 edition

Created on 2016.05.30 1185 views
11
ABOUT
PROJECT TIMELINE

I have designed 6 DOF robotic arm as a research project in National University of Sciences and Technology (NUST), Islamabad, Pakistan. This robotic arm is the first prototype of laparoscopic surgical robot. It took me almost year and half to design it and year more in the manufacturing.
Basic Design and Modelling is done using SOLIDWORKS and stress analysis were performed using Simulia Abaqus.
Thanks to solidworks it makes this work not only easier but also very interesting.
Please Dont forget to watch the video of this Working Robotic Arm.

Découvrez l'équipe
Auteurs du projet
PL Projects Legacy
Découvrez les logiciels
logiciels utilisés
11
Project Timeline
Project Timeline