Screenshot
Jaw Control Mechanism
Stress Analysis Using Abaqus
Stress Analysis Using Abaqus
Gear Drive
Manufactured 1
Robot and Master

TELE SURGICAL ROBOTIC ARM

8th Fan Votes Winner - 2015 edition

Created on 2016.05.30 548 views
11
ABOUT
PROJECT TIMELINE

I have designed 6 DOF robotic arm as a research project in National University of Sciences and Technology (NUST), Islamabad, Pakistan. This robotic arm is the first prototype of laparoscopic surgical robot. It took me almost year and half to design it and year more in the manufacturing.
Basic Design and Modelling is done using SOLIDWORKS and stress analysis were performed using Simulia Abaqus.
Thanks to solidworks it makes this work not only easier but also very interesting.
Please Dont forget to watch the video of this Working Robotic Arm.

Discover the team
Who’s behind this project
PL Projects Legacy
Discover the solution
Software used for this project
11
Project Timeline
Project Timeline
What's next?
Share it !
X
Copy link to clipboard
Facebook Twitter

MULTIFUNCTION CHAIR

SOLIDWORKS

NN
Share it !
X
Copy link to clipboard
Facebook Twitter

TABLE TORSIONED

SOLIDWORKS

PL
Share it !
X
Copy link to clipboard
Facebook Twitter
FIRST Robotics
Inspire young people to science and technology leaders
Share it !
X
Copy link to clipboard
Facebook Twitter
Share it !
X
Copy link to clipboard
Facebook Twitter

COMPOSITE BICYCLE FRONT FORK

ABAQUS Student Edition

PL
Share it !
X
Copy link to clipboard
Facebook Twitter

AMG PETRONAS F1 CAR

SOLIDWORKS

PL

Explore

Share it !
X
Copy link to clipboard
Facebook Twitter